EST

Call for paper
April Edition 2017

International Journal of Applied Information Systems solicits high quality original research papers for the
March 15, 2017
April 2017 Edition of the journal.
The last date of research paper submission is
March 15, 2017
SUBMIT YOUR PAPER

Number 1

Conceptualize Model of Procurement System through ERP

User Rating: 0 / 5

Star InactiveStar InactiveStar InactiveStar InactiveStar Inactive
 

PrintEmail

journal image
 Download
806
  • Soubhik Mishra and Sameer Jain and Lav Kumar Jain and Tapaswi Kanchenrla and S. Vidyashiny 2015. Conceptualize Model of Procurement System through ERP. International Journal of Applied Information Systems. 9, 1 (June 2015), 9-13. DOI=http://dx.doi.org/10.5120/ijais451355
  • @article{10.5120/ijais2017451568,
    author = {Soubhik Mishra and Sameer Jain and Lav Kumar Jain and Tapaswi Kanchenrla and S. Vidyashiny},
    title = {Conceptualize Model of Procurement System through ERP},
    journal = {International Journal of Applied Information Systems},
    issue_date = {June 2015},
    volume = {9},
    number = {},
    month = {June},
    year = {2015},
    issn = {},
    pages = {9-13},
    numpages = {},
    url = {/archives/volume9/number1/747-1355},
    doi = { 10.5120/ijais15-451355},
    publisher = { xA9 2015 by IJAIS Journal},
    address = {}
    }
    
  • %1 451355
    %A Soubhik Mishra
    %A Sameer Jain
    %A Lav Kumar Jain
    %A Tapaswi Kanchenrla
    %A S.  Vidyashiny
    %T Conceptualize Model of Procurement System through ERP
    %J International Journal of Applied Information Systems
    %@ 
    %V 9
    %N 
    %P 9-13
    %D 2015
    %I  xA9 2015 by IJAIS Journal
    

Abstract

The main scope of construction Industry lies with the starting step of conceptualization. ERP system works across Domain, Customer data linking with micro and macro world in construction Industry and to provide full scope for any kind of purchasing behavior of resources. To provide slab, recommendations and data to help employee base in taking sound decision adhering to company's policy. To innumerate and forecast various constraints and possibilities which can influence the procurement in Construction Industry. The adequate follows to the failures in the Construction Real Estate Infrastructure Project (CRIP) Industry such as, lack of managerial experience, Non-use of documentations and relevant available information. The study has also got us to develop that transparency, automation, integration with adherence to the procedures and regulatory policies of the company, industry, government and law of the land, when incorporated in project governance with efficiency then we acquire the speed and best value for money

References

  1. Aliza Abu Hassim, Project Governance : Ethical decision making in project procurement in the malaysian public sector
  2. Katri Karjalainen, Challenges of purchasing centralization, emprical evidence from public procurement
  3. Mikael Erikkson, Procurement of comlex technical systems, stratergies for successful projects.
  4. Bjarne Rerup Schlitcher,Pernille Kraemmergaard," A comprehensive literature review of the erp research field over na decade.
  5. PED Love,A Gunasekaran, H Li, "Concurrent engineering," a stratergy for procuring construction projects.
  6. Ram Singh , "Delays and cost overruns in infrastructure projects,"An enquiry into extends, causes and remedies.
  7. Antonio Davila,Mahendra Gupta,Richard. J Palmer, Moving procurement system to internet, The adoption and use of E-procurement technology models
  8. Bernard Wieder, Peter Booth,Zoltan P. Matolcsy and Maria-Luise Ossimitz,The impact of erp system on firm and business process performance
  9. Charles Moller, ERP II,a conceptual framework for next generation enterprise sysytems
  10. Sherry Finney,Martin Corbett, ERP implementation, a complication and analysis of critical success factors
  11. Luis F. Alarcon,Rodrigo Rivas and Alfredo Serpell, Evaluation and improvement of the procurement processin construction projects
  12. Abhijeet Garekar, Dr. S. S. Pimplikar,Success and failure factors of indian construction companies.
  13. R. Preston McAFEE, John McMILLAN, Government procurement and international trade.
  14. Radia Benamghar,Atushi Iimi,Efficiency in public procurement in ruralroad projects of nepal.
  15. Richard A. Wysk,ISE 789 product and process engineering.
  16. Kennaeth K. L. Leung,IT research paper on ERP.
  17. Erik Fosser,Ole Hendrik Leister,Carl Erik Moe,Mike Newmen, ERP systems and advantages, some initial results.
  18. Juha Vehvilainen, Procurement in projectimplementation.
  19. Derek Walker,Steve Rowlinson,Procurement systems,a cross industry perspective.
  20. Tan Phat Nguyen,Nicholas Chileshe,Revising the critical factors causing failure of construction projects in Vietnam.
  21. Marwa a. Wardani,Comparng procurement for design-build projects.
  22. Jakob Edler,Luke Georghiou,Public procurement and innovation, Resurrecting the demand side.

Keywords

Procurement, material management, ERP, information technology (IT) based, project systems

Index Terms

Computer Science
Information Sciences